- Industry
- Oil and Gas
- Headquarters
- Baku
- Founded
- 2017
- Size
- 11–50 employees
- Revenue
- not disclosed
About Azorel LMP
Our base has 27 current employees, 4 decision-makers among them. Over the last 12 months 8 people joined and 9 left (net -1).
In Azorel LMP's own words
Azorel Liquid Mud Plant is located on the shore of the Caspian Sea in Baku, Azerbaijan and specialized in production of drilling fluids, provision of engineering services for drilling. Currently we have fluid tanks with capacity of more than 10000 barrels, bulk tanks with capacity of 1000 tons and two mixing tanks with capacity of 500 barrels each. The mud plant is operating according to Joint Cooperation Agreement signed with Halliburton Eurasia. We provide drilling fluid services for SOCAR AQS on two gas and gas condensate wells on UMID and BULLA offshore gas fields and supplying barite to Gunashly shallow water oil field. In partnership with Halliburton we provide competent and experienced drilling and completions fluids engineers, maintenance of all necessary mud testing equipment, technical assistance. Our approach to HSE encompasses the full cycle of prevention, delivery, monitoring and improvement to provide a comprehensive system. Azorel LLC is in possession of huge surrounding unoccupied area with perspective of further expansion. Our company is also experienced and specialized in supply of different types of drilling equipment required for operations at drilling site. Azorel is in partnership with Swire Oilfield Services providing a wide range of offshore cargo carrying solutions including Cargo Carrying Unit (CCU) products, modular systems, accessories and CCU related services such as certification, testing and inspection, maintenance and repair. Our onshore/offshore containers include over 300 different designs. Based on technical knowledge and experience we provide inspection services of high competence and quality, non-destructive tests, maintenance and refurbishment. Azorel LLC participated and won the tender for Provision of Waste Management Services on UMID-1 18 well, announced by “UMID BABEK OPERATING COMPANY”. As of now, Azorel is fully handling Waste Management Services (WMS) for Umid-1 18 well with “Umid Babek Operating Company”.
Headcount steady — a routine buying cycle.
People at Azorel LMP
27 people in our base · 4 decision-makers
Hiring and departures
Last 12 months, from career dates · full coverage of the team in our base
Where people come from and go
Previous and next employers in the career history of Azorel LMP's team
Came from
Moved to
Azorel LMP: questions and answers
How many employees does Azorel LMP have?
11–50 employees. Our base has 27 current employees: Operations (7), Engineering and Technical (6), Finance & Accounting (3), Administrative (3), Project Management (2), General Management (1).
Where do Azorel LMP employees come from?
Most often from Caspian Drilling Fluids (4).
Where is Azorel LMP headquartered?
Baku, Azerbaijan.
When was Azorel LMP founded?
2017.
Is Azorel LMP hiring?
8 people joined over the last 12 months.
What technology does Azorel LMP use?
Seen on the website: Font Awesome, Google Font API, reCAPTCHA, WordPress, SPF, DMARC, DMARC Quarantine, Hetzner, German Server Location.
Who are the decision-makers at Azorel LMP?
4 decision-makers. Names, work emails and phones are in your Aidenix account.
Data as of Oct 31, 2026 from public company pages, job boards and public profiles. Is this your company? Request a correction or removal.