Persian Gulf Bidboland Gas Refining Company
pgbidboland.ir · LinkedIn · 683 followers
Persian Gulf Bidboland Gas Refining Company (pgbidboland.ir) is a chemical manufacturing company based in behbahan, behabahn, JO, with 1001–5000 employees.
- Industry
- Chemical Manufacturing
- Headquarters
- behbahan, behabahn
- Size
- 1001–5000 employees
- Revenue
- not disclosed
About Persian Gulf Bidboland Gas Refining Company
Our base has 87 current employees, 9 decision-makers among them. Over the last 12 months 0 people joined and 1 left (net -1).
In Persian Gulf Bidboland Gas Refining Company's own words
Description: “Bid Boland Gas Treating Plant-II (BB2)'' is located in South West part of Iran, about 15 km North West of Behbahan city in Khuzestan province. Bid Boland Gas Treating Plant-II is comprised of industrial and non-industrial areas. Package A consists of the gas treating plant (Industrial Area) located in near Bid Boland I gas refinery plant. The sour outlet gas of sour feed gas slugcatcher is routed to four identical parallel amine units and treated gas is combined with sweet outlet gas of sweet feed gas slugcather will be processed in cryogenic plant, and the extracted C2+ hydrocarbons will be fractionated and treated, the ethane product will be transferred to Gachsaran Petrochemical while the propane and butane products will be transferred to storage and loading facilities at Mahshahr Loading Facilities. The treated residue gas will be routed to the existing NIGC gas pipeline. The condensate from the inlet separation unit will be collected and treated and then the C5+ product along with the C5+ product from fractionation unit will be transported to Mahshahr Loading facilities. The main process units are as below: Inlet Separation and Metering Facilities Unit 401: Slug Catchers> Unit 402: Condensate Splitter/Gas Gas Sweetening Units Unit 420: Amine Units (4*25% Identical Units each 500 MMSCFD) Acid Gas Compression and Dehydration Unit 421: Acid Gas Dehydration (3*50% Trains) Acid Gas Compression (3*50% Trains) NGL Extraction/Ethane Recovery Unit 404: 2*50% trains (each 1000 MMSCFD) of Ethane Recovery/ NGL Extraction NGL Fractionation Unit 406: 2*50% Trains, identical capacities. Product Treating Unit 407: Ethane, Propane and Butane treating Propane Refrigeration Unit 408: Propane Refrigeration Unit (3*50% Trains) Residue Gas Compression Unit 405: Residue Gas Compression for injection to NIGC gas pipeline (6*20% Trains) Sour Water Stripping Sour Water Stripping The License Units are as below: Amine Sweetening (Prosernat) Mol Sieve, Dehydration (Zeochem - Technology Holder) Caustic Wash: C4 and C5+ Sulfur Removal (RIPI) Product Treating (Zeochem - Technology Holder) The required technologies are as below: Amine Sweetening Mol Sieve, Dehydration Caustic Wash: C4 and C5+ Sulfur Removal COS Hydrolysis, C3 Mercury Removal Arsenic Removal
Headcount steady — a routine buying cycle.
People at Persian Gulf Bidboland Gas Refining Company
87 people in our base · 9 decision-makers
Hiring and departures
Last 12 months, from career dates · full coverage of the team in our base
Where people come from and go
Previous and next employers in the career history of Persian Gulf Bidboland Gas Refining Company's team
Came from
Persian Gulf Bidboland Gas Refining Company: questions and answers
How many employees does Persian Gulf Bidboland Gas Refining Company have?
1001–5000 employees. Our base has 87 current employees: Engineering and Technical (40), Operations (18), Project Management (5), Trades (3), Other (3), Consulting (2).
Where do Persian Gulf Bidboland Gas Refining Company employees come from?
Most often from OTC - Oil Turbo Compressor (3), Oil Industries’ Commissioning and Operation Company (OICO) (2), Shahid Tondgouyan Petrochemical Company (S.T.P.C) (2), Bidboland Gas Refinery (2), Sazeh Consultants (2).
Where is Persian Gulf Bidboland Gas Refining Company headquartered?
behbahan, behabahn, JO.
Is Persian Gulf Bidboland Gas Refining Company hiring?
0 people joined over the last 12 months.
What technology does Persian Gulf Bidboland Gas Refining Company use?
Seen on the website: CrUX Dataset, CrUX Top 5m, SPF, DMARC, DMARC None, DMARC Reject, Persian Server Location.
Who are the decision-makers at Persian Gulf Bidboland Gas Refining Company?
9 decision-makers. Names, work emails and phones are in your Aidenix account.
Data as of Sep 26, 2026 from public company pages, job boards and public profiles. Is this your company? Request a correction or removal.