BME High Voltage Laboratory logo

BME High Voltage Laboratory

BME High Voltage Laboratory (bme.hu) is a higher education company based in Budapest, Budapest, Hungary, with 11–50 employees.

4Employeeson LinkedIn · 2 profiles in our base
1Decision-makersnames and work emails in your account
−1Team change, 12 months0 joined · 1 left
Industry
Higher Education
Headquarters
Budapest, Budapest
Size
11–50 employees
Revenue
not disclosed

About BME High Voltage Laboratory

Our base has 2 current employees, 1 decision-maker among them. Over the last 12 months 0 people joined and 1 left (net -1).

In BME High Voltage Laboratory's own words

The High Voltage Laboratory is situated in a common building with the Block “V1” of the University of Technology and Economics in Budapest. It has a 24.16 m x 16.26 m sized area with 386 m2 effective interior space, and its height is 16.45 m. The craned hall is designed regarding the required flash-over and breakdown distances to ensure safe operation of the highest voltage equipment in the laboratory. The installations that belong to the High Voltage Laboratory are the localized and the mobile high, medium, low and extra low voltage equipment inside the lab, the substation in open air next to the hall of the High Voltage Laboratory supplying the 600 kV test transformer, the line, the adapting and the regulator transformer and their parts (environment-friendly basement, protective wall, rainproof roof), their feed cables and couplers, as well as all of the equipment which protect and feed these. Furthermore other main equipment are installed on the ground floor of the Laboratory, which are supplied by the 800 kVA transformer and 0.4 kV switchgear. In the history of the High Voltage Laboratory the first important equipment was a 250 kV transformer which is still in use. It was followed by the impulse generator which is capable of generating up to 1 MV peak value impulses. In the ‘70s the high voltage live line maintenance was introduced in Hungary, and at the same time the Laboratory was equipped with a 600 kV test transformer and with a 750 kV impulse generator. In the summer of 2012 the Laboratory was completely renovated. The largest Tesla-coil of Hungary is also located in the Laboratory. The main workplace of Group of High Voltage Technology and Equipment of the Department of Electric Power Engineering of BUTE is located in the Block “V1” of the University of Technology and Economics in Budapest.

People at BME High Voltage Laboratory

2 people in our base · 1 decision-maker

50 free rows · no card

Hiring and departures

Last 12 months, from career dates · full coverage of the team in our base

Joined0
Left−1
Net-1
Senior hires0

BME High Voltage Laboratory: questions and answers

How many employees does BME High Voltage Laboratory have?

11–50 employees. Our base has 2 current employees: Education (1), General Management (1).

Where is BME High Voltage Laboratory headquartered?

Budapest, Budapest, Hungary.

Is BME High Voltage Laboratory hiring?

0 people joined over the last 12 months.

What technology does BME High Voltage Laboratory use?

Seen on the website: Google Analytics, Google Universal Analytics, Google Analytics 4, Google Analytics Classic, Global Site Tag, Apple Whitelist, Google Font API, CKEditor, COVID-19, CrUX Dataset, CrUX Top 500k, CrUX Top 1m, Google Tag Manager, US Privacy User Signal Mechanism, Cloudflare Radar, Cloudflare Radar Top 50k, Pixabay, Pexels, Japanese Yen, Pound Sterling, Euro, Drupal, Drupal 7, Drupal 10, DoubleClick.Net, Mailgun, Microsoft Azure DNS, SPF, Office 365 Mail, Microsoft Exchange Online.

Who are the decision-makers at BME High Voltage Laboratory?

1 decision-maker. Names, work emails and phones are in your Aidenix account.

Data as of Oct 31, 2026 from public company pages, job boards and public profiles. Is this your company? Request a correction or removal.