- Industry
- Higher Education
- Headquarters
- Hamburg, HH
- Founded
- 2023
- Size
- 51–200 employees
- Revenue
- not disclosed
About CRC 1615 SMART Reactors - TUHH
Our base has 3 current employees, 0 decision-makers among them. Over the last 12 months 2 people joined and 0 left (net +2).
In CRC 1615 SMART Reactors - TUHH's own words
In the DFG Collaborative Research Centre 1615 "SMART Reactors for Future Process Engineering", we are working with scientists from the fields of process engineering, materials science, electrical engineering, chemistry, physics and mathematics to create the scientific basis for a new generation of reactors for the process engineering of a sustainable future. These "S M A R T" reactors will convert in a more Sustainable way renewable resources into different products (Multi-purpose) and operate Autonomously (self-adapting), leading to more Resilient processes that are more Transferable between scales and locations. Started in 2023, CRC 1615 is divided into three scientific project areas, which are closely interlinked and build on each other: In Project Area A, "Development of components for in situ detection and self-regulation of SMART reactors", individual reactor components (e.g. stimuli-responsive polymeric internals, reactive catalytic surfaces) will be developed and their self-regulation mechanisms are tested on a small scale. In Project Area B, "Experimentally assisted modelling of local process conditions tailored with self-adaptive components", the process conditions required for the SMART reactors targeted in Project Area C will be investigated experimentally and numerically with regard to thermodynamics, local transport phenomena and their actuation mechanisms in real process environments. This will clarify how the components delivered by Project Area A will need to adapt to cope with critical process conditions. Project Area C, "Investigating self-adjustment of SMART reactors at pilot scale", will develop concepts for the integration of individual components from Project Area A into prototype reactors, which are operated according to the models and insights gained in Project Area B. Both the reaction itself and the corresponding downstream processing (e.g. formulation) will be addressed exemplarily for fluid-fluid and solid-fluid systems.
People at CRC 1615 SMART Reactors - TUHH
3 people in our base · 0 decision-makers
Hiring and departures
Last 12 months, from career dates · full coverage of the team in our base
CRC 1615 SMART Reactors - TUHH: questions and answers
How many employees does CRC 1615 SMART Reactors - TUHH have?
51–200 employees. Our base has 3 current employees: Research (3).
Where is CRC 1615 SMART Reactors - TUHH headquartered?
Hamburg, HH, Germany.
When was CRC 1615 SMART Reactors - TUHH founded?
2023.
Is CRC 1615 SMART Reactors - TUHH hiring?
2 people joined over the last 12 months.
What technology does CRC 1615 SMART Reactors - TUHH use?
Seen on the website: Matomo, Apple Whitelist, Wordpress Plugins, CrUX Dataset, CrUX Top 500k, Azure Active Directory, Cloudflare Radar, Cloudflare Radar Top 100k, Google Custom Search, TYPO3, WordPress, Many Subdomains, DFN, German Server Location, SPF, DMARC, DMARC None, Apache, Apache 2.4, nginx.
Who are the decision-makers at CRC 1615 SMART Reactors - TUHH?
0 decision-makers. Names, work emails and phones are in your Aidenix account.
Data as of Oct 31, 2026 from public company pages, job boards and public profiles. Is this your company? Request a correction or removal.