Eta - Abdul Salam Yaseen Co.
eta-water.com · LinkedIn · 1.1K followers
Eta - Abdul Salam Yaseen Co. (eta-water.com) is a construction company based in Muscat, Muscat, Oman, founded in 1999, with 51–200 employees.
- Industry
- Construction
- Headquarters
- Muscat, Muscat
- Founded
- 1999
- Size
- 51–200 employees
- Revenue
- not disclosed
About Eta - Abdul Salam Yaseen Co.
Our base has 45 current employees, 4 decision-makers among them. Over the last 12 months 1 person joined and 0 left (net +1).
In Eta - Abdul Salam Yaseen Co.'s own words
Abdul Salam Yaseen & Sons Company, commonly known as Eta, stands as a significant Palestinian institution founded in 1999 within the Gaza Strip. Unlike conventional local businesses, ETA's inception wasn't solely driven by profit motives; rather, it was born from a visionary perspective. The founder, Mr. Abdul Salam Yaseen, an entrepreneur at heart, identified a pressing global and local issue that needed immediate attention—the water crisis. From the outset of this entrepreneurial journey, Mr. Yaseen recognized that achieving ambitious goals required building essential resources and expertise along the way. As a result, ETA embarked on its journey by trading various types of domestic, agricultural, and industrial water and wastewater pumps. The company also provided maintenance parts, accessories, fittings, and devices. In 2003, ETA expanded its horizons in the realm of water and wastewater engineering by venturing into the import and manufacturing of large-scale water desalination units and plants. Initially, the company began with the importation of ready-made water desalination units, offering assembly and maintenance services. Over a short period, ETA transitioned to manufacturing most unit components in-house, excluding high-tech elements like Reverse Osmosis Membranes and pumps. Elements such as control panels, boosters, piping systems, pressure vessels, and purification fittings were crafted on-site. This strategic move positioned ETA as a leader in the industry, gaining a competitive edge in terms of price, quality, and customization options. ETA now stands as the exclusive manufacturer of water desalination plants in Palestine, with a remarkable portfolio of over 500 RO technology-based desalination plants, varying in capacities, sizes, and applications, assembled and manufactured up to 2018. ETA remains dedicated to addressing critical water issues, reaffirming its commitment to sustainable solutions and continuous growth.
Headcount steady — a routine buying cycle.
People at Eta - Abdul Salam Yaseen Co.
45 people in our base · 4 decision-makers
Hiring and departures
Last 12 months, from career dates · full coverage of the team in our base
Eta - Abdul Salam Yaseen Co.: questions and answers
How many employees does Eta - Abdul Salam Yaseen Co. have?
51–200 employees. Our base has 45 current employees: Engineering and Technical (9), General Management (7), Other (5), Sales (5), Operations (5), Trades (4).
Where is Eta - Abdul Salam Yaseen Co. headquartered?
Muscat, Muscat, Oman.
When was Eta - Abdul Salam Yaseen Co. founded?
1999.
Is Eta - Abdul Salam Yaseen Co. hiring?
1 people joined over the last 12 months.
What technology does Eta - Abdul Salam Yaseen Co. use?
Seen on the website: Global Site Tag, Google Analytics, Google Analytics 4, Google Font API, Wordpress Plugins, Contact Form 7, WP Mobile Menu, WP Attachments, Google Tag Manager, US Privacy User Signal Mechanism, WordPress, DoubleClick.Net, SPF, Office 365 Mail, Microsoft Exchange Online, DMARC, DMARC None, Palestinian Server Location, Limestone Networks, Apache, nginx.
Who are the decision-makers at Eta - Abdul Salam Yaseen Co.?
4 decision-makers. Names, work emails and phones are in your Aidenix account.
Data as of Sep 26, 2026 from public company pages, job boards and public profiles. Is this your company? Request a correction or removal.